The Nebraska Department of Transportation (NDOT) reports that weather permitting, work will resume April 1 on I-80, from reference post 238.27 to reference post 247.88.
I-80 between Lexington and Overton will be transitioned into two-lane, two-way traffic on the westbound lanes with a single read more…
The article: I-80 Construction Will Resume, from Lexington to Overton on April 1, was originally published on I-80 Exit Guide